Monday, 1 July 2013

Urgent Public Meeting Saturday July 6

Message from Carolyn Habib Ward Councillor for Marion and State Liberal candidate for Elder

I have been urged by your neighbours in Marion and Oaklands Estate to call a public meeting to discuss concerns regarding the rail revitalisation project that is currently underway in our community.

Your neighbours have contacted me with concerns regarding the number of trees set for removal along the railway and that the current proposal for an underpass may not be the best and safest option for the people of the area.

I have asked Vickie Chapman, the Deputy State Liberal Leaders and Shadow Transport Minister, to attend the meeting to hear your views directly and give us advice on how we can advocate to ensure the rail electrification improves safety and has minimal impact on the community.

URGENT PUBLIC MEETING DETAILS

Regarding tree removal and railway safety
Saturday 6 July 2-3pm
corner of Bassi Street and Minchinbury Terrace, Marion

(should there be rain, shelter will be provided)

Problems commenting?
Email us and we'll post on your behalf

Using an underpass in a wheelchair

Romana Challans, a resident of Brighton, is a frequent user of the Noarlunga line, including Marion station. Romana has a spinal injury, which means she travels the rail network in either an electric or manual wheelchair. 

She is a frequent user of Marion station, which has a level crossing at the northern end of the platform which allows her to park and ride.

In a recent interview on ABC 891, Romana compares the experience of crossing the rail using an underpass (such as Brighton or Hove), an overpass (such as the one at Marion), or a new  gated level crossing, such as the one at Oaklands station.

Her verdict? A decision to remove the existing at level crossing from the northern end of the station and replace it with an underpass leaves her taking the bus (if she can).

Also, Paul Gardner-Stephens, resident of Minchinbury Terrace, Marion, talks about his experiences living close to the underpass at Ascot Park and explains why the vegetation along the rail corridor is a community asset.


June 28 mp3 of the interviews (16 min:19 seconds)

Make your voices heard


Residents on both sides of the rail line are concerned about the information being provided regarding the new underpass at the Marion Railway Station.

Firstly, the information being provided by The Department of Planning, Transport and Infrastructure has not been consistent and it is necessary that this issue is clarified.

Secondly, and importantly, the issue of whether an underpass is the best outcome for our community has neither been discussed nor proved.  The underpass concept has been provided as the sole solution for a pedestrian crossing but without any opportunity for real input from the community. There was no discussion of the options nor the benefits and losses associated with each possible choice.

The trees to be removed are not restricted to the few isolated trees the OERA was informed of earlier, but now changes to losing six significant eucalyptus trees, as well as other trees, in a single mass removal.


From vegetation maps supplied by DTIP

Having trouble posting?


Could we design a better pedestrian crossing?


If we look up and down the line from Adelaide to Noarlunga, stations such as Marion, Woodlands, Hove and Oaklands Park, that were 'upgraded' to a single grade-separated crossing, had level maze crossings later added in response to community concerns. 
If an underpass is built at the northern end of Marion station, in all likelihood a level pedestrian crossing will eventually be added at the southern end to improve access to and from the school and reduce the risks to personal safety presented by the underpass!
Could we save a lot of time and money by simply designing a better at level crossing?

What do you think?

Underpass plan would remove the existing maze crossing


Despite its age, Marion is among the most pleasant and safe of our local stations, with a grade separated overpass nearest the school and a maze crossing at ground level at the northern end of the platform.  
The maze crossing is preferred to the overpass by many residents – particularly those with mobility issues who struggle with lengthy slopes and stairs associated with overpasses (or underpasses). The current plan would remove the ground level crossing at the northern end of the platform, leaving an underpass as the single means of crossing the rail line for all pedestrians – including school children.
By contrast, nearby Ascot Park has a single underpass. It lacks a level crossing because the geography does not allow it. While rail users are separated from moving trains, they are subject to personal assault and harassment in the underpass. The Ascot Park underpass is persistently dirty, a frequent target for vandals, and generally feels unsafe.  Tragically a young man was accidentally killed by a train while jumping off the platform to cross the tracks in order to avoid using the underpass.

Interestingly, the recent upgrade to modernise Oaklands station involved installing gated at-level crossings and removing the underpass.

Despite its age our current station is one of the more pleasant and safe of our local stations. Photo taken from southern end near the overpass, soon to be removed.

Comment

Use the comment box to respond or send us an email and we'll post for you.

Gated level crossing like at Oaklands

Received this comment from another OERA member today:

What I cannot understand is why they don't simply have a gated level crossing like at Oaklands. Would be simpler and cheaper. I'm sure Marion isn't the only station with a school nearby! What they don't seem to have addressed is the question of car parking by rail commuters and parents picking up children from school.  There are always cars parked all day in Fiscom and Bassi and several extras at school finishing time.

What do you think?
Use the comments box or email asafemarionstation@gmail.comasafemarionstation@gmail.com and we'll post for you.

Resident wants answers

Marion resident Robert Riggs has contacted local MPs, the MInister for Transport and the rail revitalisation project to ask the following questions.  We post an excerpt of his letter below with his permission.

I would like answers to the following:

Project analysis

What are the advantages of an underpass over the gated level crossings that are being installed at other locations for the disabled and the elderly?

Risk assessment

What provides the basis of the mooted underpass being supported in a risk assessment when the following I trust have been factored in;

• That underpasses have a documented history of assaults, robberies and sexual assault in Adelaide

• That the wider community has requested underpasses be removed for all of the above reasons plus graffiti attacks, vandalism, etc

• That while there have been deaths at railway crossings, any that were at the old style non gated crossing cannot be utilised in any risk assessment.  A risk assessment must factor in the proposed equipment that is being evaluated so only deaths at a gated level crossing can be factored in.

Cost benefit analysis 

How can an underpass with its expensive construction requirements, disruption, and ongoing maintenance costs come out as the most cost effective option in comparison to a gated level crossing?

Environmental impact 

How could the environmental assessment that would be a component of the evaluation of the underpass favour the wanton destruction of a large number of protected river red gums?  The proposed new plantings – but not in the immediate vicinity - do not replace the existing habitat that has been formed over 150 plus years.  Particularly when the factor of increasing and uncontrolled public vandalism will in all probability see many of any replacement plantings destroyed. 

These four points need an answer to not only myself but the community as a whole who are only now realising what the ongoing impact will be of this underpass.